Toronto · Ward 12 · PRIVATE
330 Spadina Rd
141 units · 22 storeys · built 1967 · managed by CAPREIT
LTB orders, Jan–May 2026
3Rent control
Likely rent-controlledFire code
1Investment (5 yrs)
3Building facts
Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.
Area context: 3,449 requests to 311 in postal area M5R in 2026 so far (most common: Residential Bin Lid Damaged; Property Standards and Maintenance Viola; Sidewalk Snow Clearing Required). Area-level only — the public 311 data does not identify addresses.
Fire code violations
45 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 1 currently open. Most frequent:
- Maintenance of closures (3)
- Damaged fire separations (3)
- /7.2.2.1. Records of Test (Elevator) (2)
Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.
Recent building permits
| Issued | Type | Work | Est. cost | Status |
|---|---|---|---|---|
| Aug 8, 2025 | Plumbing(PS) | Building Permit Related(PS) | — | Inspection |
| Mar 7, 2023 | Building Additions/Alterations | Interior Alterations | $50,000 | Inspection |
| Aug 22, 2022 | Building Additions/Alterations | Garage Repair/Reconstruction | $96,455 | Permit Issued |
Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.
Landlord and Tenant Board orders
How to read these orders and codes →
| File | Application | Date | Order |
|---|---|---|---|
| LTB-L-012344-26 | L1 eviction application for rent arrears | Apr 23, 2026 | |
| LTB-T-068216-25 | T2 tenant application — rights | Apr 1, 2026 | |
| LTB-L-094116-25 | L1 eviction application for rent arrears | Feb 4, 2026 |
Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.