Toronto · Ward 21 · PRIVATE
4 Antrim Cres
65 units · 10 storeys · built 1989 · managed by CENTURION PROPERTY ASSOCIATES INC.
LTB orders, Jan–May 2026
2Rent control
Likely rent-controlledFire code
0Investment (5 yrs)
3Building facts
Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.
Area context: 3,454 requests to 311 in postal area M1P in 2026 so far (most common: Long Grass and Prohibited Plants on Priv; Property Standards and Maintenance Viola; Driveway Blocked By Plowed Snowbank). Area-level only — the public 311 data does not identify addresses.
Fire code violations
29 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 0 currently open. Most frequent:
- Maintenance of closures (4)
- (Do Not Use) (2)
- Operation of closures (1)
Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.
Recent building permits
| Issued | Type | Work | Est. cost | Status |
|---|---|---|---|---|
| Apr 8, 2025 | Building Additions/Alterations | Garage Repair/Reconstruction | $253,000 | Permit Issued |
| Mar 16, 2023 | Fire/Security Upgrade | Multiple Projects | $13,225 | Inspection |
| Sep 2, 2021 | Building Additions/Alterations | Interior Alterations | $650,000 | Inspection |
Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.
Landlord and Tenant Board orders
How to read these orders and codes →
| File | Application | Date | Order |
|---|---|---|---|
| LTB-L-026983-26 | L1 eviction application for rent arrears | Apr 24, 2026 | |
| LTB-L-044529-25 | A1 application — is the Act applicable | Feb 20, 2026 |
Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.