Toronto · Ward 12 · PRIVATE
40 Pleasant Blvd
163 units · 32 storeys · built 1969 · managed by YONGE PLEASANT HOLDINGS LTD.
LTB orders, Jan–May 2026
3Rent control
Likely rent-controlledFire code
0Investment (5 yrs)
2Building facts
Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.
Area context: 1,240 requests to 311 in postal area M4T in 2026 so far (most common: Road Pothole / Road Damage; Property Standards and Maintenance Viola; Residential Bin Lid Damaged). Area-level only — the public 311 data does not identify addresses.
Score history
| Evaluation | Score |
|---|---|
| Aug 15, 2023 | 92 |
| Nov 18, 2025 | 94 |
Fire code violations
48 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 0 currently open. Most frequent:
- Maintenance of closures (4)
- /6.7.1.1. Records of Test (Emergency Power Systems) (3)
- Accumulation of combustible materials (3)
Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.
Recent building permits
| Issued | Type | Work | Est. cost | Status |
|---|---|---|---|---|
| Apr 26, 2023 | Building Additions/Alterations | Garage Repair/Reconstruction | $40,000 | Work Not Started |
| May 19, 2022 | Fire/Security Upgrade | Fire Alarm | $10,000 | Inspection |
Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.
Landlord and Tenant Board orders
How to read these orders and codes →
| File | Application | Date | Order |
|---|---|---|---|
| LTB-L-038412-26 | L4 eviction — breached a settlement or order | May 8, 2026 | |
| LTB-T-092456-24 | T2 tenant application — rights | Mar 25, 2026 | |
| LTB-T-002731-25 | T2 tenant application — rights | Mar 24, 2026 |
Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.