Toronto · Ward 06 · TCHC
495 Wilson Ave
132 units · 5 storeys · built 1995 · managed by TORONTO COMMUNITY HOUSING CORPORATION
LTB orders, Jan–May 2026
1Rent control
Likely rent-controlledFire code
0Investment (5 yrs)
7Building facts
Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.
Area context: 3,899 requests to 311 in postal area M3H in 2026 so far (most common: Residential Bin Lid Damaged; Road Pothole / Road Damage; Driveway Blocked By Plowed Snowbank). Area-level only — the public 311 data does not identify addresses.
Fire code violations
10 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 0 currently open. Most frequent:
- /6.3.2.2. Records of Test (Fire Alarm) (1)
- /6.2.7.5. Records of Test (Fire Extinguishers) (1)
- /6.5.5.3. Records of Test (Water Flow Test) (1)
Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.
Recent building permits
| Issued | Type | Work | Est. cost | Status |
|---|---|---|---|---|
| Jul 14, 2026 | Mechanical(MS) | Alter: Boiler/Furnace/AC Replacement | $750,000 | Permit Issued |
| Apr 8, 2026 | Building Additions/Alterations | Interior Alterations | — | Revision Issued |
| Mar 26, 2026 | Mechanical(MS) | Building Permit Related(MS) | — | Revision Issued |
| Mar 26, 2026 | Plumbing(PS) | Building Permit Related(PS) | — | Revision Issued |
| Nov 19, 2025 | Mechanical(MS) | Building Permit Related(MS) | — | Inspection |
| Nov 19, 2025 | Building Additions/Alterations | Interior Alterations | $500,000 | Inspection |
Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.
Landlord and Tenant Board orders
How to read these orders and codes →
| File | Application | Date | Order |
|---|---|---|---|
| LTB-L-014429-26 | L1 eviction application for rent arrears | May 1, 2026 |
Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.