Toronto · Ward 21 · TCHC
6 Glamorgan Ave
184 units · 12 storeys · built 1971 · managed by TORONTO COMMUNITY HOUSING CORPORATION
LTB orders, Jan–May 2026
1Rent control
Likely rent-controlledFire code
0Investment (5 yrs)
6Building facts
Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.
Area context: 3,454 requests to 311 in postal area M1P in 2026 so far (most common: Long Grass and Prohibited Plants on Priv; Property Standards and Maintenance Viola; Driveway Blocked By Plowed Snowbank). Area-level only — the public 311 data does not identify addresses.
Fire code violations
31 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 0 currently open. Most frequent:
- Maintenance of closures (4)
- Installation requirements (2)
- /6.4.3.2. Records of Test (Standpipe - Hydrostatic) (1)
Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.
Recent building permits
| Issued | Type | Work | Est. cost | Status |
|---|---|---|---|---|
| Apr 7, 2025 | Plumbing(PS) | Building Permit Related(PS) | — | Inspection |
| Apr 7, 2025 | Building Additions/Alterations | Interior Alterations | $2,000,000 | Inspection |
| Aug 15, 2022 | Building Additions/Alterations | Garage Repair/Reconstruction | $120,000 | Inspection |
| Sep 16, 2021 | Plumbing(PS) | Building Permit Related(PS) | — | Inspection |
| Sep 16, 2021 | Mechanical(MS) | Building Permit Related(MS) | — | Permit Issued |
| Sep 16, 2021 | Building Additions/Alterations | Interior Alterations | $1,583,000 | Inspection |
Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.
Landlord and Tenant Board orders
How to read these orders and codes →
| File | Application | Date | Order |
|---|---|---|---|
| LTB-L-026470-26 | L4 eviction — breached a settlement or order | Mar 30, 2026 |
Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.