Toronto · Ward 12 · SOCIAL HOUSING

747 St Clair Ave W

97 units · 8 storeys · built 1986 · managed by AYKLER

RentSafeTO score

93
evaluated Sep 12, 2025 · proactive score 93 · what scores mean

LTB orders, Jan–May 2026

2
2.1 per 100 units · most are arrears filings

Rent control

Likely rent-controlled
first occupied before Nov 15, 2018 — the annual guideline (2.1% in 2026) applies · details

Fire code

0
open violations · 21 recorded since 2018 · last inspection Oct 14, 2025

Investment (5 yrs)

1
building permit since Aug 2021 · ~$5,774 estimated work

Building facts

Heatingelectric
Laundry roomyes
Parkingsurface parking
Visitor parkingunavailable
Bike parkingnot available
Elevators2
Sprinklersno
Fire alarmyes
Barrier-free entranceyes
Pets allowedyes
Non-smokingyes
Hydro metered per unitno
Gas metered per unitno
Intercomyes
Lockers / storageno

Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.

Area context: 3,931 requests to 311 in postal area M6C in 2026 so far (most common: Sidewalk Snow Clearing Required; Residential Bin Lid Damaged; Road Plowing Request). Area-level only — the public 311 data does not identify addresses.

Score history

EvaluationScore
Sep 28, 202394
Sep 12, 202593

Fire code violations

21 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 0 currently open. Most frequent:

Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.

Recent building permits

IssuedTypeWorkEst. costStatus
Dec 3, 2025Plumbing(PS) Backflow Prevention Devices (Water only)$5,774Inspection

Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.

Landlord and Tenant Board orders

How to read these orders and codes →

FileApplicationDateOrder
LTB-L-044537-26L4
eviction — breached a settlement or order
May 29, 2026PDF
LTB-L-095825-25L1
eviction application for rent arrears
Feb 4, 2026PDF

Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.

Landlord or manager of this building? You can request a correction or add a response that will appear beside this record. Every fact above links to its official source and date.