Toronto · Ward 04 · PRIVATE

77 Spencer Ave

56 units · 6 storeys · built 1952 · managed by AKELIUS CANADA LTD

RentSafeTO score

92
evaluated Jul 7, 2026 · proactive score 92 · what scores mean

LTB orders, Jan–May 2026

1
1.8 per 100 units · 1 above-guideline increase · most are arrears filings

Rent control

Likely rent-controlled
first occupied before Nov 15, 2018 — the annual guideline (2.1% in 2026) applies · details

Fire code

0
open violations · 1 recorded since 2018 · last inspection Jul 25, 2024

Investment (5 yrs)

3
building permits since Aug 2021 · ~$2,000 estimated work

Building facts

Air conditioningindividual units
Heatinghot water
Laundry roomyes
Parkingground level garage
Visitor parkingunavailable
Bike parking0 indoor parking spots and 8 outdoor parking spots
Elevators1
Sprinklersyes
Fire alarmyes
Barrier-free entranceno
Pets allowedyes
Non-smokingno
Hydro metered per unityes
Gas metered per unitno
Intercomyes
Lockers / storageno

Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.

Area context: 3,396 requests to 311 in postal area M6K in 2026 so far (most common: Property Standards and Maintenance Viola; Injured - Wildlife; Amplified or Musical Instrument Noise). Area-level only — the public 311 data does not identify addresses.

Score history

EvaluationScore
Aug 22, 202496
Jul 7, 202692

Recent building permits

IssuedTypeWorkEst. costStatus
Jan 30, 2023Plumbing(PS)Other(PS)$2,000Inspection
Dec 29, 2022Plumbing(PS)Building Permit Related(PS)Inspection
Jul 13, 2022Plumbing(PS)Building Permit Related(PS)Inspection

Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.

Landlord and Tenant Board orders

How to read these orders and codes →

FileApplicationDateOrder
LTB-L-009569-23L5
above-guideline rent increase application
Apr 9, 2026PDF

Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.

Landlord or manager of this building? You can request a correction or add a response that will appear beside this record. Every fact above links to its official source and date.