Toronto · Ward 24 · TCHC
110 Mornelle Crt
145 units · 15 storeys · built 1971 · managed by DEL MANAGEMENT
LTB orders, Jan–May 2026
1Rent control
Likely rent-controlledFire code
0Investment (5 yrs)
1Building facts
Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.
Area context: 4,264 requests to 311 in postal area M1E in 2026 so far (most common: Residential Bin Lid Damaged; Property Standards and Maintenance Viola; Injured - Wildlife). Area-level only — the public 311 data does not identify addresses.
Score history
| Evaluation | Score |
|---|---|
| Sep 18, 2024 | 88 |
| Jul 21, 2026 | 94 |
Fire code violations
19 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 0 currently open. Most frequent:
- Measures in a fire safety plan (1)
- /6.3.3.8 - Records of Test (Smoke Alarms) (1)
- Maintenance of closures (1)
Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.
Recent building permits
| Issued | Type | Work | Est. cost | Status |
|---|---|---|---|---|
| Sep 16, 2025 | Building Additions/Alterations | Garage Repair/Reconstruction | $700,000 | Inspection |
Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.
Landlord and Tenant Board orders
How to read these orders and codes →
| File | Application | Date | Order |
|---|---|---|---|
| LTB-L-096386-25 | A2 application — sublet or assignment | Apr 22, 2026 |
Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.