Toronto · Ward 08 · PRIVATE
14 Saranac Blvd
28 units · 3 storeys · built 1954 · managed by SIGNET GROUP INC.
LTB orders, Jan–May 2026
0Rent control
Likely rent-controlledFire code
1Investment (5 yrs)
1Building facts
Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.
Area context: 1,692 requests to 311 in postal area M6A in 2026 so far (most common: Property Standards and Maintenance Viola; Residential Bin Lid Damaged; Driveway Blocked By Plowed Snowbank). Area-level only — the public 311 data does not identify addresses.
Score history
| Evaluation | Score |
|---|---|
| Aug 12, 2024 | 87 |
| Aug 5, 2026 | 89 |
Fire code violations
3 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 1 currently open. Most frequent:
- Storage rooms (1)
- /6.4.3.7.(1) Records of Test (Standpipe - FD Connections) (1)
- Installation requirements (1)
Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.
Recent building permits
| Issued | Type | Work | Est. cost | Status |
|---|---|---|---|---|
| Jul 25, 2025 | Building Additions/Alterations | Interior Alterations | $164,000 | Inspection |
Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.
Landlord and Tenant Board orders
How to read these orders and codes →
No final LTB orders were published for this address between January and May 2026. Earlier years will appear as Tribunals Ontario backfills its catalogue to 2021.