Toronto · Ward 12 · PRIVATE
250 Heath St W
81 units · 17 storeys · built 1975 · managed by WJ PROPERTIES
LTB orders, Jan–May 2026
1Rent control
Likely rent-controlledFire code
0Investment (5 yrs)
2Building facts
Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.
Area context: 2,562 requests to 311 in postal area M5P in 2026 so far (most common: Sidewalk Snow Clearing Required; Road Pothole / Road Damage; Residential Bin Lid Damaged). Area-level only — the public 311 data does not identify addresses.
Fire code violations
53 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 0 currently open. Most frequent:
- Maintenance of closures (7)
- Accumulation of combustible materials (7)
- Damaged fire separations (4)
Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.
Recent building permits
| Issued | Type | Work | Est. cost | Status |
|---|---|---|---|---|
| May 5, 2023 | Plumbing(PS) | Other(PS) | $300,000 | Permit Issued |
| Apr 25, 2023 | Building Additions/Alterations | Garage Repair/Reconstruction | — | Revision Issued |
Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.
Landlord and Tenant Board orders
How to read these orders and codes →
| File | Application | Date | Order |
|---|---|---|---|
| LTB-T-072973-23 | T2 tenant application — rights | May 26, 2026 |
Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.