Toronto · Ward 13 · TCHC

375 Bleecker St

327 units · 24 storeys · built 1969 · managed by GREENWIN

RentSafeTO score

77
evaluated Sep 10, 2024 · proactive score 78 · what scores mean

LTB orders, Jan–May 2026

1
0.3 per 100 units · most are arrears filings

Rent control

Likely rent-controlled
first occupied before Nov 15, 2018 — the annual guideline (2.1% in 2026) applies · details

Fire code

0
open violations · 90 recorded since 2018 · last inspection Apr 21, 2026

Investment (5 yrs)

4
building permits since Aug 2021 · ~$5,113,000 estimated work

Building facts

Heatinghot water
Laundry roomyes
Parkingunderground garage , garage accessible thru buildg , surface parking
Visitor parkingpaid
Bike parkingnot available
Elevators3
Sprinklersyes
Fire alarmyes
Barrier-free entranceyes
Pets allowedyes
Non-smokingyes
Hydro metered per unitno
Gas metered per unitno
Intercomyes
Lockers / storageyes

Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.

Area context: 1,318 requests to 311 in postal area M4X in 2026 so far (most common: Property Standards and Maintenance Viola; Sidewalk Snow Clearing Required; Injured - Wildlife). Area-level only — the public 311 data does not identify addresses.

Fire code violations

90 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 0 currently open. Most frequent:

Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.

Recent building permits

IssuedTypeWorkEst. costStatus
Jul 23, 2026Fire/Security UpgradeElectromagnetic Locks$5,000Permit Issued
Aug 18, 2025Fire/Security UpgradeOther(FS)$108,000Permit Issued
Apr 25, 2025Plumbing(PS)Building Permit Related(PS)Inspection
Mar 6, 2025Building Additions/AlterationsInterior Alterations$5,000,000Inspection

Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.

Landlord and Tenant Board orders

How to read these orders and codes →

FileApplicationDateOrder
LTB-L-037259-26L4
eviction — breached a settlement or order
May 4, 2026PDF

Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.

Landlord or manager of this building? You can request a correction or add a response that will appear beside this record. Every fact above links to its official source and date.