Toronto · Ward 15 · PRIVATE

85-95 Thorncliffe Park Dr

496 units · 43 storeys · built 1971 · managed by MORGUARD CORPORATION

RentSafeTO score

90
evaluated Aug 26, 2024 · proactive score 92 · what scores mean

LTB orders, Jan–May 2026

12
2.4 per 100 units · most are arrears filings

Rent control

Likely rent-controlled
first occupied before Nov 15, 2018 — the annual guideline (2.1% in 2026) applies · details

Fire code

0
open violations · 52 recorded since 2018 · last inspection May 7, 2026

Investment (5 yrs)

2
building permits since Aug 2021 · ~$4,150,000 estimated work

Building facts

Air conditioningindividual units
Heatingforced air gas
Laundry roomyes
Parkingunderground garage , garage accessible thru buildg , surface parking
Visitor parkingboth
Bike parking63 indoor parking spots and 0 outdoor parking spots
Elevators6
Sprinklersyes
Fire alarmyes
Barrier-free entranceyes
Pets allowedyes
Non-smokingyes
Hydro metered per unityes
Gas metered per unitno
Intercomyes
Lockers / storageyes

Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.

Area context: 501 requests to 311 in postal area M4H in 2026 so far (most common: Property Standards and Maintenance Viola; Road Pothole / Road Damage; Adequate Heat). Area-level only — the public 311 data does not identify addresses.

Fire code violations

52 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 0 currently open. Most frequent:

Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.

Recent building permits

IssuedTypeWorkEst. costStatus
Sep 5, 2025Building Additions/AlterationsGarage Repair/Reconstruction$250,000Inspection
Feb 5, 2025Building Additions/AlterationsGarage Repair/Reconstruction$3,900,000Inspection

Permits filed at this address since August 2021 (City of Toronto building permits, active file). Permit activity is a sign the owner is investing in the building; estimated costs are as declared by the applicant.

Landlord and Tenant Board orders

How to read these orders and codes →

FileApplicationDateOrder
LTB-L-063565-25L1
eviction application for rent arrears
May 27, 2026PDF
LTB-L-095826-25L1
eviction application for rent arrears
May 26, 2026PDF
LTB-L-095708-25L1
eviction application for rent arrears
May 21, 2026PDF
LTB-L-017457-26L4
eviction — breached a settlement or order
Apr 16, 2026PDF
LTB-L-004897-26L1
eviction application for rent arrears
Apr 8, 2026PDF
LTB-L-004899-26L1
eviction application for rent arrears
Apr 8, 2026PDF
LTB-L-017457-26L4
eviction — breached a settlement or order
Mar 2, 2026PDF
LTB-L-109388-25L2
eviction application (other reasons)
Feb 24, 2026PDF
LTB-L-106437-25L1
eviction application for rent arrears
Feb 19, 2026PDF
LTB-L-095624-25L1
eviction application for rent arrears
Jan 29, 2026PDF
LTB-L-097089-25L1
eviction application for rent arrears
Jan 16, 2026PDF
LTB-L-091203-25L2
eviction application (other reasons)
Jan 13, 2026PDF

Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.

Landlord or manager of this building? You can request a correction or add a response that will appear beside this record. Every fact above links to its official source and date.