Toronto · Ward 12 · PRIVATE

9 Deer Park Cres

95 units · 17 storeys · built 1965 · managed by CROMWELL MANAGEMENT INC.

RentSafeTO score

98
evaluated Jul 16, 2024 · proactive score 98 · what scores mean

LTB orders, Jan–May 2026

1
1.1 per 100 units · 1 above-guideline increase · most are arrears filings

Rent control

Likely rent-controlled
first occupied before Nov 15, 2018 — the annual guideline (2.1% in 2026) applies · details

Fire code

0
open violations · 54 recorded since 2018 · last inspection Apr 15, 2026

Investment (5 yrs)

0
building permits since Aug 2021

Building facts

Air conditioningcentral air
Heatinghot water
Laundry roomyes
Parkingunderground garage , ground level garage , garage accessible thru buildg , surface parking
Visitor parkingboth
Bike parking15 indoor parking spots and 0 outdoor parking spots
Elevators2
Sprinklersyes
Fire alarmyes
Barrier-free entranceyes
Pets allowedyes
Non-smokingyes
Hydro metered per unityes
Gas metered per unitno
Intercomyes
Lockers / storageyes

Self-reported by the building owner or manager at RentSafeTO registration; City of Toronto open data.

Area context: 2,096 requests to 311 in postal area M4V in 2026 so far (most common: Road Pothole / Road Damage; Residential Bin Lid Damaged; Sidewalk Snow Clearing Required). Area-level only — the public 311 data does not identify addresses.

Fire code violations

54 violation records since 2018 in Toronto Fire Services' high-rise inspection data; 0 currently open. Most frequent:

Source: Toronto Fire Services residential inspection results, refreshed daily. A violation record is a finding at inspection time; open items are those without a recorded close date.

Landlord and Tenant Board orders

How to read these orders and codes →

FileApplicationDateOrder
LTB-L-037749-23L5
above-guideline rent increase application
Mar 9, 2026PDF

Final orders published by Tribunals Ontario (Jan–May 2026 release). An order records the outcome of an application; a high count of L1 (arrears) filings reflects filing activity, not the state of the building. Orders with confidentiality directives are excluded at source.

Landlord or manager of this building? You can request a correction or add a response that will appear beside this record. Every fact above links to its official source and date.